PERFORMANCE / OEE

OEE that points at a cause, not just a number.

Overall Equipment Effectiveness only helps if you can act on it. HEKA connects availability, performance and quality to the process, line and shift that created the result.

HEKA PERFORMANCE LIVE SHIFT
OEE84.7% 3.2% this shift
Availability91%
Performance88%
Quality96%
OEE BY HOURTarget 85%
06:0008:0010:0012:0014:00
LINE STATUS4 running
Assembly 0187%
Assembly 0282%
Packaging76%
SQDCP TODAYDaily management
SSafety0
QQuality98.6%
DDelivery94%
CCost+1.8%
PPeople96%
Why it matters

A number on a board nobody knows how to move.

Plenty of factories track OEE and still can't say why it dropped last Tuesday. The measurement lives apart from the work. HEKA measures OEE where the work happens, against the instruction in use, so the number always comes with the losses behind it.

The three factors

Availability. Performance. Quality. Connected to the work.

Availability

See downtime as it happens

Capture stops, changeovers and micro-stoppages against the line and process, so lost time is visible in the moment, not reconstructed from memory at the end of the shift.

Performance

Cycle time against the standard

Because HEKA holds the standard work, you can compare real cycle time to the instruction the operator is following, and see where the process drifts from the plan.

Quality

Defects tied to the step

Link scrap and rework to the exact step and revision in use. Quality problems stop being anonymous and start pointing at a cause you can fix.

Insight

One OEE number, with the story behind it

Roll availability, performance and quality into a single OEE figure per line or cell, then drill straight into the losses that moved it. Numbers your team can actually act on.

Why HEKA sees more

The standard and the result, in one place.

Most OEE tools bolt onto machines and stop there. HEKA also holds the work instruction the operator is running, so it can compare what should happen with what did. That context is what turns a dashboard into a decision.

  • Losses attributed to a line, cell, process and revision
  • Cycle time compared against the approved standard work
  • Trends that survive shift changes and staff turnover

Ready to make OEE actionable?

We help you connect performance measurement to the work your floor actually does, starting with a single line.