All case studiesCase study · Automotive OEM / Tier 1

The hidden cost of paper work instructions

One manufacturing engineer. 150 work instruction pages printed and posted every month during a new-model ramp-up. This is what that costs in hours, paper and CO2, and what changes when the instructions go digital.

Calculate your savings
151h
given back to one engineer every year

That is about one month of engineering time a year that goes back into process improvement, launch readiness and quality, instead of printing, walking and swapping pages.

95%

less time spent printing, walking and swapping pages (159 h down to 8 h a year)

1,800

sheets a year that are no longer printed and thrown away, per engineer

~2%

of the cost of paper instructions is paper. The other 98% is people's time.

Baseline: field data from automotive OEM / Tier 1 production, provided by the HEKA founder, who was the manufacturing engineer responsible for these changes. HEKA figures are modelled from published industry results and will be confirmed with measured pilot data. Base case shown; low and high cases below.

The baseline

One engineer, one paper loop, 150 times a month

During a new-model ramp-up, a lot changes behind the scenes: items are removed, part locations move, the model is updated, a supplier changes. Every one of those changes has to reach the work instruction at the station, and often at several stations.

3,000

pages printed per vehicle model at launch

100 to 200

pages printed a month for changes, by one engineer

8 runs

to the printer a month, with about 15 min of walking each

4 min

per page to hang the new one, remove the old one and sign it off

The loop behind every page change

  1. 1
    Print

    Industrial printer, about 70 pages a minute

  2. 2
    Check

    Confirm the format is right, or reprint

  3. 3
    Walk

    To the printer, then to the line: about 15 min per run

  4. 4
    Hang

    Post the new page in the right place

  5. 5
    Swap

    Remove the old page and sign it off

Printing is the fast part: 150 pages take about 2 minutes. The time goes into 8 trips a month of about 15 minutes each, and about 4.5 minutes per page to check, hang, swap and sign.

Automotive OEM / Tier 1, new model

The engineer maintains existing instructions while the model settles. The cost is in the change loop above.

  • 3,000-page launch package per vehicle model
  • 100 to 200 pages printed a month for changes
  • About two pages per station, some printed twice for a repair station

Plants without a SOP system

The engineer builds each instruction in Word or Excel. Creating one takes 1.5 to 2 hours, before approval and printing:

  • Photos and shapes or callouts
  • Tools and equipment
  • Parts and quantity per part
  • Fixing the format until it fits

Source: HEKA founder's own experience as the responsible manufacturing engineer.

Engineering time

Where one engineer's year goes

Automotive OEM / Tier 1: hours a year spent on page changes (base case)

151 h backper engineer per year, about one month

Automotive OEM / Tier 1LowBaseHigh
Pages printed per month, copies included100150200
Print runs per month888
Hours a year today114159205
Hours a year with HEKA888
Hours back106151197
Months of engineering time0.71.01.3
Value at CHF 70 per hourCHF 7.4kCHF 10.6kCHF 13.8k
Plant without a SOP systemLowBaseHigh
New instructions per year60100150
Time to create one, today1.5 h1.75 h2 h
Time to create one, with HEKA45 min37 min24 min
Hours back (creation, print and posting)64145288
Months of engineering time0.40.91.9
Value at CHF 70 per hourCHF 4.5kCHF 10.2kCHF 20.1k

Today: printing at 70 pages a minute, about 15 minutes of walking per print run and 4.5 minutes per page to check, hang, swap and sign. With HEKA, each release is reviewed, published to every station that uses it (a repair station included) and announced to the line: we count 5 minutes per release. Without a SOP system, each new instruction is its own print run. Creation time with HEKA is 50%, 65% and 80% faster in the three cases, the range published by digital work instruction vendors. One engineer year = 1,850 productive hours. Both scenarios are per engineer and can apply to the same person.

Paper, waste and CO2

Every page printed is a page thrown away later

A posted work instruction has one destiny: the next change makes it obsolete and it goes in the bin. Paper avoided is waste avoided.

Per engineer, per year (automotive base case)

1,800
sheets not printed or discarded
9 kg
paper not produced
12 kg
CO2e avoided
13,500 L
water (range 3,600 to 23,400)
0.2
trees

Per vehicle model program, 5 years (launch package plus changes)

12,000
sheets not printed or discarded
60 kg
paper not produced
80 kg
CO2e avoided
90,000 L
water (range 24,000 to 156,000)
1.4
trees

It scales with every engineer: ten engineers at the base rate means 18,000 sheets, 90 kg of paper and 120 kg CO2e every year.

Paper is the cheap part

Cost of paper work instructions for one engineer, per year (base case)

People's time: CHF 11,200 (98%) Paper and printing: CHF 180 (2%)

The case for digital instructions is mainly time and control. The environmental gain is real and grows with every engineer, line and plant.

Factors used. One A4 sheet (80 g/m²) weighs 5.0 g. Paper production: 1.34 kg CO2e per kg (UK Government GHG conversion factors 2024, primary paper). Water: 2 to 13 L per A4 sheet, midpoint 7.5 L (UNESCO-IHE, van Oel and Hoekstra 2010). Trees: 24 per tonne of virgin office paper (Conservatree). These cover paper production only. Printing energy, toner, plastic sleeves, transport and disposal are not included, so the real saving is higher. Screens also have a footprint: HEKA runs in any browser, so the PCs and screens already at the line can be reused.

What changes with HEKA

From a paper loop to one controlled release

Today: paper
  1. Buildin Word or Excel
  2. Formatand re-format
  3. Signon paper
  4. Printand check
  5. Walk, hang, swapold page to the bin
With HEKA
  1. Createby hand or with AI
  2. Layoutin your template, automatically
  3. Approvewith change note and work order
  4. Publishonce, to every station
  5. Retireold version automatically

Faster to create

AI drafts the steps, tools, parts and consumables from a short video of the job or from an existing PDF instruction. The engineer reviews and corrects instead of starting from a blank page.

No more formatting

Template Studio applies your company layout automatically, on screen and on paper. Printed copies carry a QR code that opens the current version.

Controlled release

Every change carries a description and a work order. It is reviewed, approved and published to every station at once, in minutes instead of the next shift.

Audit-ready history

When a version is retired, HEKA records the last work order built with it. You can show which units were built to which revision, the core of ISO 9001 and IATF 16949 document control.

Real step times

Operators run the instruction at the station and HEKA records time per step. Line balancing gets real data without a stopwatch study.

Feedback from the floor

Operators flag issues and comment on the instruction itself, so the engineer hears about a problem before it becomes a defect.

These gains are not included in the hours above. Faster change, fewer outdated pages and better audit evidence are additional value.

Calculator

Run your own numbers

Start from a scenario, then change any number to match your plant. Results update as you type, and you can copy a link to share your numbers.

Start from
Your team
Creating new instructions
65%

industry 50–80%, HEKA claims up to 80%

Printing and posting pages today
Advanced assumptions
Hours back per engineer, every year
151h

about 1.0 months of one engineer's year, worth CHF 10,600 a year

Your team over 5 years
757
engineering hours back
0.4
full engineer years
CHF 53,000
value of that time
Paper and planet over 5 years
12,000
sheets not printed or discarded
60 kg
paper not produced
80 kg
CO2e avoided
90,000 L
water, 24,000 L to 156,000 L
1.4
trees

Paper and printing are only 2% of what paper instructions cost you today. The rest is people's time.

Estimates from your inputs. HEKA time savings use the published industry range and will be confirmed with measured pilot data. Environmental factors cover paper production only: 5.0 g per A4 sheet, 1.34 kg CO2e per kg of paper (UK Government GHG conversion factors 2024), 2 to 13 litres of water per sheet (UNESCO-IHE), 24 trees per tonne of virgin office paper (Conservatree).

How we calculated

Transparent inputs, conservative choices

  • Baseline from field data: 3,000 pages per vehicle model at launch, 100 to 200 pages printed a month for changes by one engineer (including the occasional second copy for a repair station), about 8 print runs a month with 15 minutes of walking each, about 4 minutes per page to hang the new page, remove the old one and sign it off, 1.5 to 2 hours to create one instruction without a SOP system.
  • Printing at 70 pages a minute on an industrial colour printer (Canon imageRUNNER ADVANCE DX C5870i), plus 30 seconds to check each page. HEKA needs 5 minutes per release to review, publish to every station that uses it and notify the line.
  • Creation time with HEKA is 50% to 80% shorter, the range published by digital work instruction vendors. HEKA will confirm its own figure with pilot measurements.
  • Engineer cost CHF 70 per hour. The average Swiss labour cost is CHF 63.62 per hour (FSO, 2020), and engineers earn above average. One engineer year is 1,850 productive hours.
  • Paper and printing CHF 0.10 per sheet. Environment factors as listed above.
  • Not counted: the content edit itself (the same in both cases), handling time for the launch package, training time and the cost of a defect caused by an outdated page.

Sources

  1. UK Government GHG conversion factors 2024: paper, primary production, 1,339 kg CO2e per tonne (via Climatiq)
  2. van Oel and Hoekstra (2010), The green and blue water footprint of paper products, UNESCO-IHE
  3. Trees in a ton: Conservatree figures via Dogwood Alliance
  4. Swiss labour costs, Federal Statistical Office via the SECO KMU portal
  5. Canon imageRUNNER ADVANCE DX C5800 series: up to 70 pages a minute (A4)
  6. ISO 9001:2015 clause 7.5.3, control of documented information (QI-A)

Become a pilot case study

We measure your baseline before go-live and your results after. Publish under your company name or anonymously: HEKA always knows the plant, the public sees only what you approve.